Success story: Tengizchevroil (Kazakhstan - Central Asia Countries)Supply and electrical management of the Tengiz oil production site
Key customer benefits:
I. CUSTOMER ENVIRONMENT / PROJECT CONTEXTCustomer profile:Tengizchevroil (TCO) operates the Tengiz oil production site, situated in the Caspian region of Kazakhstan. TCO is a joint enterprise set up by Chevron with ExxonMobil, Kazakhstan Ventures Inc., Kazmunaigas and LukArco. Customer objective and constraints:The customer objective is to increase the existing oil and gas production: - 300,000 to 550,000 barrels of oil per day by 2008 - 400,000 to 750,000 standard cubics feet of gas per day by 2008 II. SOLUTION IMPLEMENTATIONImplementation methodology (main phases):As part of this project, Schneider Electric has offered a complete solution for the electrical supply to new installations, and for the site's control and monitoring system :
Duration:From 2002 to 2007 Solution overview (services, products, systems, architectures…):
Electrical supply The Tengiz oil production site has its own electrical energy production (gas turbines) and uses the 110 Kv national grid as a standby power source. For the site's expansion, the installed power has been doubled ( 500 MW).For the Second Generation Project (SGP), Schneider Electric has carried out:
The EMCS enables users to monitor the quality of the network's electrical power. Its manages the elctrical distribution network and controls lighting and heating in the facilities; The system is totally integrated with existing systems.
Power Management System (PMS)
Test and training simulator
III. RESULTS / ACHIEVEMENTCustomer benefits:
Schneider Electric differentiating values VS competitors:
|